::: << Prev ::: Thumbs ::: Next >> :::  
Click for next picture
030 of 180. 2nd floor under the tarp. Roof rafters waiting to be put up. The hole in the floor in the lower-left of the picture is where the stairs will be. 01/03/04
Copyright (c) 2004, Ed Welch
Album made with Easy Imager